In most workshops and factories, a minimum capacity of 45m3 to a maximum of 180 m3 is a common capacity for batching plants. To transfer conctrete in this capacity, Standard Machine’s concrete pumps can be used.
Concrete can be transported easily and quickly to inaccessible locations.
Using concrete pumps, the number of labour needed is reduced and less control is required because the concrete can be transferred directly to the desired location.
Concrete transportation is not directly influenced by weather conditions.
Standard Machine’s concrete pump can transport concrete at the same speed as the mixer feeds them ensuring increased efficiency